Posted on | Posted in Uncategorized


 

 

The Corporation of Shepherdstown will begin construction of the dedicated high service water line.  This construction is necessary to improve our overall operation of our water system in preparation of the new water treatment system. Construction will begin on or around Monday, November 13 in the area of West High Street (from Duke Street to King Street).  High Street will be reduced to “one lane” allowing traffic to travel westbound only.  For more information, contact Kenny Shipley, Project Inspector, at (304) 876-3350 or Frank Welch, Public Works Director, at (304) 876-3322.